Started Finished Hours
4/22/2005 17.25
Construction Log
Part Date Hours Log
Final Assembly 4/22/05 0.75 Applied "Experimental" Plaque on upper baggage panel, and passengar warning on panel. Installed interior panels.
5/14/05 0.5 Partially installed pilot seat belt.
5/16/05 0.5 Applied N Numbers to VS.
5/31/05 0.75 Created and applied labels to panel.
6/1/05 2.25 Installed passengar seat belt and torqued all belt bolts. Installed gear leg bolts and AN4-12A bolts in lower ldg gear mount. Marked battery restraining strap for cutting, and cut lightening holes.
6/3/05 2.5 Started bleeding brakes.
6/5/05 5.5 Installed center tunnel cover. Attached static lines to instruments. Attached pitot lines to instruments.  Tightened panel screws and removed excess tie wrap length. Installed 'stereo in' plug in panel and soldered connections.
6/7/05 1.75 Drilled wood blocks to fit spar bolts for tie-down point for transport to airport. Attached wood stub spars to fuselage. Installed starter solenoid diode.
6/17/05 2.75 Attched VS/HS to fuselage. Torqued all bolts. Attached elevators/rudder, and checked control movement.
Final Assembly 17.25